+41 78 420 42 10


Leads and supports projects in automation

We provide solutions

If you are building a new plant or optimizing existing production, we are the right partner for you.
We support you in the MSR planning, take over the project management, commissioning and qualification of your plant.
Planning & consulting for process measuring and control technology

Planning experience in the chemical and pharmaceutical industries, air conditioning, heating, refrigeration and special plants

Commissioning

Your partner for commissioning of plants on site with great know-how in electrical and control engineering

Qualification

We are happy to support you with the qualifications of your plant





About us

Sandro Frank, Executive Director

I started my professional career as an electrician in an SME. I quickly discovered my passion for industry. As an industrial electrician, I was able to gain experience in the field of new development, expansion, troubleshooting and maintenance of technical systems of all kinds. I underpinned my practical experience with theoretical knowledge and successfully completed my training as an electrical engineer HF. Afterwards I could use and build up my knowledge for several years as a project manager in industrial and building automation projects. I would be happy to share my know-how with you and support you in your project.


Contact

Please contact us. We are at your disposal and look forward to hearing from you.

ControlX GmbH
Sonnhaldenstrasse 9
CH-6373 Ennetbürgen

+41 78 420 42 10

info@controlx.ch 


Experience

We are experienced, but new to the market as our own company. Here is a selection of our previous activities. We will be happy to inform you about reference projects in a personal meeting.

Heating / Cooling / Heat recovery

Optimization of the energy balance

A large cable manufacturer decided to use the waste heat from the production facilities for the building heating. For this purpose, the entire recooling plant was rebuilt. The heat generation now extends over several buildings with their own heating systems and heat pumps, which now cover the heat load in a network.

Media preparation

Supply of process media

The media required for the production of medicines (tempered water, compressed air, steam, acids and bases, and fuel) were treated and fed into the manufacturing process. The wastewater resulting from production was neutralized and passed on to the cantonal wastewater treatment plant.

Ventilation / Air conditioning

Air conditioning for productions & offices

Air conditioning in production plants have to meet different criteria, usually they have pressure cascades and precise temperature control. In many cases, office spaces are also connected to improve comfort for employees.

Safety / Special plants

Fire detection and containment

Various tunnels for road traffic were equipped with fire detection and direct forwarding of alarms.

In case of a fire in a production building, the precise procedure is central. Thanks to the built-in control system the fire department has an overview of the effects of possible shutdowns on zones, ventilation systems or machines. The smoke extraction of escape routes can be switched on selectively.